#501

The edging service is paid not by geometry but by the billing length — and it is always no less than the geometric one. The difference covers technological losses: the tape's lead-in and lead-out on the machine, trimming, waste. The formula depends on whether the edge is straight or curved.

A straight edge

For a straight side the billing length is built in three steps:

  1. Minimum length. If the side is shorter than the minimum (a company production parameter), its length is pulled up to that minimum. Very short edges are not billed «at zero».
  2. Waste percentage. A company-set waste percentage is added to the length.
  3. Edge stock. A doubled edge stock is added (stock on both ends) — the tape runs past the edge and is trimmed.

The result: max(length, minimum) × (1 + waste%) + 2 × edge_stock. All three values are the company's production parameters.

A curved edge

For curved edging (grooves, milling cuts) the calculation is simpler: the geometric length is multiplied by a curvature surcharge — length × (1 + curvature_surcharge%). Curved application is slower and more wasteful than straight, so a metre of curved edge «costs» more than a metre of straight. The surcharge size is set by the company.

Why billing ≥ geometric

Geometry is the «clean» length of the edged section. The billing length is always greater than or equal to it: the bare length gets the minimum, waste, stock or curvature surcharge added. In the project summary both numbers stand side by side — you see how far the «paper» metre diverges from the real one.

What this means in practice

Many small parts with short edges — the billing length is noticeably larger than the geometric one because of the pull-up to the minimum. Long straight parts — the difference is small. Curves — more expensive than a running metre of straight band by the surcharge amount.

Bottom line

The billing length is what is actually paid: a straight edge = minimum + waste% + edge stock, a curved one = length + curvature surcharge. All the coefficients are in the company's production parameters, and both numbers (geometry and billing) are visible in the project summary.